General contracting works of the United Parcel Service (UPS) Istanbul (IST) Airport Gateway Building are successfully carried out by POLARKON within as much as six months in total time.
The building is built on a plot of approximately 15.000 m², with a total area of 3.250 m² of management and operation section, where 6.500 m² of total constuction area has been completed.
The management section consists of reinforced concrete carcass and space frame structures, that is based on a reinforced concrete carrier system.
|
Client |
UPS |
|
Type |
General Contracting Works |
|
City |
Istanbul |
|
Country |
Türkiye |
|
Total |
6.500 m² |
|
Year |
2018 |












