Put into service at the end of 2010, the airport terminal did a tremendous job in reinforcing urban identity with its unique architecture and structural steel system characteristics.
The structure stands as an important steel truss application with its 60-meter clear span. In addition, POLARKON carried out very special zipped locked insulated roof and facade metal cladding works and aluminum composite applications with all their detailed solutions. Within the scope of this project, 2.600 tons of steel and 18.000 square meter of aluminum composite materials are used.
|